|
Summary |
Top Previous Next |
|
Summary Produces various Job Summary reports
Details
The Left panel shows all Jobs. These Jobs can be limited by selecting from the Job Status drop-down or by using the grid filters. Select multiple jobs to get reports on all selected jobs
The right panel holds an index tab with three tabs:
Produces summary report on single or selected jobs. Options: Store Budgets During processing, the system stores estimates as budgets Reprice Before processing, the system reprices job(s) as at the specified date Cost Ctr Groups Reports can be amalgamated into Cost Centre Sub-Groups All Cost Centres Cost Centres without any values can be shown/suppressed Group sub-totals Cost Centres are grouped and totalled by sub-group Use Cost Ctr markups By Applying the markups set in Cost Centres, you can set differing markups Amalgamate Jobs Selected Jobs can be amalgamated into a single report Markups 3 Levels can be set to apply to the total of cost centres and any line markups Show Cost per Costs can be compared to a nominated Number Variable such as FloorArea GST Mode
Used when you want to compare one job with another Options Select database You can compare with a job in another database Compare The basis for comparison can be either Budget, Actual (invoices), Ordered or Bill amounts Reprice The comparison Job can be repriced as at the specified date Change To The price level of all items in the Comparison job can be changed
Movement of job costs over time can be tracked. The system uses historical pricing to establish costs at any point in time. Up to 6 points in time can be specified by ticking each panel and setting price levels and dates. When the refresh button
Toolbar
|